Asbestos Removal in Orange

Orange is one of the cities South Coast Air Quality Management District lists as inside its jurisdiction, so Rule 1403 covers asbestos work on Orange houses. We take care of the testing, the removal and the district filing.

Half of Orange’s homes date from 1973 or earlier, with the 1960s its biggest building decade, and over 6 in every 10 predate 1980.

Request a free quote
Older kitchen with a green, orange and tan patterned vinyl floor, white cabinets, a white gas range, a tiled backsplash and a door with a window, and a gray mat on the floor at the left.

How we can help

Ceilings

Popcorn ceiling removal begins with samples from bedroom and hall ceilings, taken before the ceilings are scraped or opened.

Orange housing

One-unit homes carry much of Orange’s housing, so the single-unit rules apply to Orange houses, and the line between a house and a condo matters.

Mostly houses

Housing in Orange tilts toward houses: more than 6 in every 10 homes are one-unit, more than 4 in every 10 households rent, and buildings of five or more units hold about 2 in every 10 homes.

Small renovations

A renovation in a residential single-unit dwelling that strips less than 100 square feet of material is carved out of the survey rule. Testing still tells you the amount.

Rules that apply in Orange

Notices for Orange work go to the district through its online application, filed no later than 10 working days ahead and accompanied by the district notification fee.

Hiring

For work of 100 square feet or more, check the CSLB license number, the C-22 Asbestos Abatement classification and the Cal/OSHA registration.

Attic with plank flooring, silver-gray foil-wrapped round ducts running along the rafters, loose insulation at the sides and light from a small vent window.

Frequently asked questions

Does a small renovation in an Orange house need a survey?

Not when it is a residential single-unit dwelling and the work removes or strips less than 100 square feet of material. Condos, townhouses and apartments are not covered by that carve-out.

Who tests the air afterward?

An independent consultant runs the clearance air test afterward, since clearance air monitoring is off limits to contractors under California law.

Is a district notice needed for a teardown?

Yes. The district must be notified of any demolition, whether or not any asbestos turns up in the building.

Anaheim has its own page too, asbestos removal in Anaheim, plus the home page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (657) 427-1784

Call (657) 427-1784