Duct wrap and seam tape
Wrap and tape are sampled where they are removed. The report lists each run, so the heating contractor and our crew work from the same inventory.
Typical cost in Garden Grove
Before a furnace or air conditioning change, wrapped ducts and insulated pipes are sampled, because the district treats installing or removing an HVAC system as renovation.
That puts a duct swap under the same survey, notice and work rules as a remodel, even when the job feels like a mechanical one.

Wrap and tape are sampled where they are removed. The report lists each run, so the heating contractor and our crew work from the same inventory.
Insulated pipes are sampled wherever the insulation is to be removed, and each sampled location appears in the survey report.
Pulling out an HVAC system is renovation under the rule. The survey and the district notice both happen before the heating crew shows up.
Ducts that run through an attic are surveyed wherever the work will disturb their wrap, and the report names each one.
A heating change touches several trades, so the survey and the paperwork have to be settled before the first duct comes down.
Work involving 100 square feet or more of material needs a Cal/OSHA registration before the work begins. Under 100 square feet, the employer files a Report of Use instead.
A duct job produces waste, and California sorts it by condition. Friable, powdered or finely divided asbestos goes out as hazardous waste, carried by a licensed hauler with a manifest.
Planning to open a wall near the ducts? Samples of plaster, drywall and joint compound lead to drywall, joint compound and plaster removal. For anything else, start at the home page.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (657) 427-1784