Example Asbestos Removal Projects in Garden Grove

The seven example jobs below are set in Garden Grove, Anaheim and Orange, from ceilings to a bearing wall. Each one lists what was sampled, what came out, the work days and an estimated cost.

Hallway and bedroom ceiling texture removed from a 1960s ranch before painting

Example project

Home
1960s ranch house in Garden Grove with textured ceilings in the hall and three bedrooms
Original request
Repaint the hall and bedrooms, with smooth ceilings in place of the texture
Testing
A Cal/OSHA-certified asbestos consultant samples the ceiling texture in the hall and each bedroom
Found
Asbestos in the ceiling texture in the hall and two of the three bedrooms
Clear
The texture in the third bedroom
Area
About 620 sq ft of ceiling
Timeline
Notice no later than 10 working days ahead, then three working days
Cost
$6,000

Scope of work

Samples and lab results, the district notice, the hall and each room sealed in turn with air filters running, the texture wetted and scraped into bags, a HEPA clean and the haul. The clearance air test, the skim coat and the paint are separate.

Project overview

In this example, a family in Garden Grove wants smooth ceilings in the hall and bedrooms before a full repaint. Scraping the old texture would put dust through the house if it is positive, so it is sampled first.

Three of the four spots test positive, and the third bedroom is clear. The abatement crew removes the texture from the hall and two bedrooms, and the painter handles the third room.

The goal

The goal is bare ceilings in the affected rooms, so the painter starts on clean board.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples each ceiling and records which rooms tested positive.
  2. Before work The abatement contractor files the district notice online.
  3. Days one to three The hall and the two bedrooms are sealed and scraped in turn.
  4. Last The ceilings are wiped, the bags are hauled out and an independent consultant tests the air.

Planning right

  • Take the bedroom furniture out of the rooms being scraped.
  • Pull down curtains and rods the day before.
  • Book the painter for after the air results.
  • Keep the lab report with the house file.

Get a free quoteMore about popcorn ceiling removal

Sheet vinyl and glue removed from a 1970s kitchen before a new floor

Example project

Home
1970s two-bedroom house in Anaheim with sheet vinyl through the kitchen
Original request
Replace the vinyl with plank flooring
Testing
A Cal/OSHA-certified asbestos consultant samples the vinyl at two spots and the glue under it
Found
Asbestos in the vinyl backing and the glue
Area
About 230 sq ft of kitchen floor
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$3,400

Scope of work

Lab results for the vinyl and the glue, the district notice, the kitchen sealed with air filters running, the vinyl lifted and the glue removed wet, bagged disposal and a cleanup. The clearance air test and the new floor are separate.

Project overview

In this example, the owners of a 1970s house in Anaheim want plank flooring in the kitchen. The sheet vinyl is glued down across the whole room, and its age calls for sampling.

Both the vinyl backing and the glue test positive. The abatement crew removes both, so the flooring installer lays planks over a clean subfloor.

The goal

The goal is a bare kitchen subfloor, so the planks are laid over nothing positive.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant cuts samples of the vinyl and the glue.
  2. Before work The abatement contractor files the district notice online.
  3. Day one The kitchen is sealed and the vinyl comes up in strips.
  4. Day two The glue is removed wet, the floor is cleaned and an independent consultant tests the air.

Planning right

  • Empty the cabinets under the sink the day before.
  • Clear the counters and the floor in front of the sink.
  • Order the planks for delivery after the air results.
  • Keep the report with the installer’s estimate.

Get a free quoteMore about floor tile and mastic removal

Wall compound removed from a bearing wall that is being replaced with a beam

Example project

Home
1970s two-story house in Orange with a family room wall that carries the floor above
Original request
Open the family room by replacing the wall with a beam
Testing
A Cal/OSHA-certified asbestos consultant samples the wall texture, the joint compound and the wallboard on both faces
Found
Asbestos in the joint compound and the wall texture
Clear
The wallboard
Area
About 80 sq ft of wall
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$2,400

Scope of work

Plastic over the family room with air filters running, the positive compound and texture removed wet from both faces of the wall, bagged disposal and a cleanup. The survey, the beam, the framing, the clearance air test and the new finish are separate.

Project overview

In this example, a family in Orange is opening up their family room. A wall that carries the floor above is coming out for a beam, and taking out a load-supporting wall counts as demolition under the district’s rule, so the notice is required however small the wall is.

The compound and the texture test positive. The abatement crew removes them from the wall first, and the framers work on a wall with nothing positive left on it.

The goal

The goal is a wall with the positive surfaces gone, so the beam goes in without disturbing them.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples both faces of the wall.
  2. Before work The abatement contractor files the district notice online, and the framers hold their date.
  3. Days one and two The room is sealed and the wall surfaces are removed wet.
  4. Last An independent consultant tests the air, then the framers shore the floor and set the beam.

Planning right

  • Take the furniture out of the family room.
  • Mark the wall’s full length for the crew.
  • Give the framers the report.
  • Hold the paint and trim until the beam is in.

Get a free quoteMore about drywall, joint compound and plaster removal

Floor and half-wall material removed where a kitchen is opened to its nook

Example project

Home
1960s ranch house in Garden Grove with a breakfast nook walled off from the kitchen by a half-wall
Original request
Take out the half-wall and lay one floor from the kitchen through the nook
Testing
A Cal/OSHA-certified asbestos consultant samples the nook floor, its glue and the joint compound on the half-wall
Found
Asbestos in the nook floor tile with its glue and in the joint compound on the half-wall
Clear
The kitchen floor
Area
About 110 sq ft of nook floor and 40 sq ft of half-wall
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$3,900

Scope of work

The kitchen and nook sealed with air filters running, the positive floor and wall material removed wet, bagged disposal and a cleanup. The survey, the district notification fee, the clearance air test, the carpentry and the new floor are separate.

Project overview

In this example, the owners of a 1960s ranch house are joining the nook to the kitchen. The half-wall comes out and one new floor runs through both spaces.

The nook tile, its glue and the wall compound test positive, while the kitchen floor is clear. The abatement crew takes out the three materials, and the carpenter and installer follow.

The goal

The goal is one bare floor level through the kitchen and nook, so the new floor goes down in a single run.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the nook, the half-wall and the kitchen floor.
  2. Before work The abatement contractor files the district notice online.
  3. Day one The area is sealed, the tile is lifted and the half-wall surfaces are removed.
  4. Day two The glue is removed wet, the area is cleaned and an independent consultant tests the air.

Planning right

  • Move the nook table and chairs out of the house.
  • Ask the installer to match the new floor height to the kitchen.
  • Plan the carpentry for a day after the air results.
  • Keep the report with the remodel file.

Get a free quoteMore about renovation and demolition abatement

Cement siding taken off a back wall before a patio is enclosed

Example project

Home
1960s house in Garden Grove with cement siding on the back wall facing the patio
Original request
Enclose the patio as a family room, which means opening and rebuilding that wall
Testing
A Cal/OSHA-certified asbestos consultant samples the siding boards in three places and the paint and caulk on them
Found
Asbestos in the cement siding boards
Clear
The caulk
Area
About 220 sq ft of siding
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$4,000

Scope of work

Plastic below the wall, whole boards taken off by hand while wet, wrapped and sealed, then hauled with a cleanup of the yard. The survey, the framing, the new wall finish, the clearance air test and the enclosure are separate.

Project overview

In this example, a family is turning their back patio into a family room. The back wall of the house is clad in cement siding, and it will be opened for new doors and windows.

The boards test positive. The abatement crew takes them off whole and wrapped, and the framers start on a bare wall.

The goal

The goal is a bare back wall, so the enclosure is framed without cutting or breaking the old boards.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the siding in three places.
  2. Before work The abatement contractor files the district notice online.
  3. Day one Plastic goes down and the boards are taken off one at a time.
  4. Day two The ground is cleaned, the wrapped boards are hauled out and an independent consultant tests the air.

Planning right

  • Move patio furniture and plants away from the wall.
  • Tell the neighbors about the truck.
  • Order the doors after the framing plan is set.
  • Keep the report with the enclosure permit papers.

Get a free quoteMore about renovation and demolition abatement

Whole-house survey for heirs preparing to sell a vacant ranch house

Example project

Home
1960s ranch house in Garden Grove, vacant since the owner’s death, three bedrooms
Original request
Prepare the house for sale and learn what is in it before a buyer asks
Testing
A Cal/OSHA-certified asbestos consultant samples ceilings, walls, floors and the attic duct wrap, about 15 samples in all
Found
Asbestos in the ceiling texture in two bedrooms and the kitchen floor glue
Clear
The wall texture, the other floors and the duct wrap
Timeline
Samples to the lab, then one written report that lists what was sampled and where
Estimated testing cost
$950

Scope of work

A visit by the consultant, about 15 samples, a lab result for each and one written report. Removal, the clearance air test and any repairs are priced separately.

Project overview

In this example, three siblings have inherited their parents’ ranch house and plan to sell it. They would rather know what is in the house than hear it from a buyer’s inspector.

The report lists two positive materials and says where each one was sampled. The siblings share it with the agent and decide whether to remove the materials before the sale.

The goal

The goal is one written report, so every owner and the agent work from the same list.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples every room and the attic.
  2. Results The lab marks the bedroom ceilings and the kitchen glue positive and the rest clear.
  3. Report The report lists each material, where it was sampled and the result.
  4. Next The heirs ask for removal quotes or pass the report to the buyer.

Planning right

  • Have the key holder meet the consultant at the house.
  • Do not take samples yourself, the consultant knows what to cut.
  • Keep the report with the sale papers.
  • Get removal quotes against the same report.

Get a free quoteMore about asbestos testing and surveys

Wrapped attic ducts removed before blown-in insulation

Example project

Home
1960s house in Garden Grove with a furnace in the garage and ducts through the attic
Original request
Add blown-in insulation to the attic, with the old ducts out of the way
Testing
A Cal/OSHA-certified asbestos consultant samples the duct wrap and the joint tape in three places
Found
Asbestos in the wrap on the main duct and its branches
Clear
The joint tape
Area
About 170 ft of duct in the attic
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$4,200

Scope of work

The attic hatch sealed, the wrapped ducts removed wet into labeled bags, bagged disposal and a cleanup. The survey, the clearance air test, the new ducts and the insulation are separate.

Project overview

In this example, the owners of a 1960s house in Garden Grove are adding attic insulation and replacing the ducts at the same time. Removing the old ducts counts as renovation under the rule.

The wrap tests positive. The abatement crew takes out the old ducts first, and the insulation crew blows in the new layer over a clean attic floor.

The goal

The goal is a bare attic floor with the old wrapped ducts gone, so the new insulation goes down on a clean surface.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the wrap and the tape in the attic.
  2. Before work The abatement contractor files the district notice online, and the insulation crew holds its date.
  3. Days one and two The hatch is sealed and the ducts are wetted, cut apart and bagged.
  4. Last An independent consultant tests the air, then the new ducts and insulation go in.

Planning right

  • Clear the garage near the furnace.
  • Tell the insulation crew the order of work.
  • Keep the lab report with the permit papers.
  • Plan for the old system to be off for the work days.

Get a free quoteMore about HVAC duct and pipe insulation removal

Request a free asbestos removal quote