Popcorn Ceiling Removal in Garden Grove

Typical cost in Garden Grove

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+

A textured ceiling that is about to be scraped, covered or opened for new lighting is renovation work. The district asks for a survey first, so the ceiling is sampled before anyone touches it.

If the lab finds asbestos, the abatement crew seals the rooms, removes the ceiling wet and hauls it away. If it does not, the ceiling is an ordinary finishing job.

Request a free quote
Empty living room with a textured popcorn ceiling, plain white walls, worn beige carpet, a sliding glass door and a window looking onto trees, and a doorway to a hall.

Ceiling jobs we handle

One bedroom or a hall

A single room is its own sampling spot. The survey names the ceiling by location, so a bedroom and the hall outside it are never lumped together.

Living areas and whole floors

Larger ceilings are listed room by room. The total area matters, because the district notice and Cal/OSHA registration both turn on the amount of material.

Ceilings opened for new lights

Cutting into a textured ceiling for recessed fixtures is renovation, so the survey comes first. Sampling covers the cavity above as well where needed.

Finishing afterward

New texture and paint are separate trades and are not part of the asbestos work. Booking them after the abatement keeps their crews out of the sealed rooms.

Notice and registration

Two filings frame a ceiling job, and both come before the first day on site.

The district notice

The notification must reach the district no later than 10 working days before the work. A notice is not counted as received without a district notification fee, so plan the calendar from the date it is filed and paid.

Registration before day one

Work involving 100 square feet or more of asbestos-containing material needs a Cal/OSHA registration, applied for and obtained before the work begins, never partway through. It binds the employer whose crew does the job.

Under 100 square feet

A renovation that strips less than 100 square feet is carved out of the notice in any building, and in a single-unit home it is carved out of the survey rule as well. Work practices and waste rules still apply, and testing is how you know the amount.

Empty room with the walls and windows covered in clear plastic sheeting, a bare wood floor and a light blue-gray portable air machine with a flexible hose.

Floor tile and sheet vinyl are written up under floor tile and mastic removal, and the home page links the other services.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (657) 427-1784

Call (657) 427-1784